Work on site - building sequence 2
See also |
Setting out the foundations of a bungalow.
[06-A-24a] | ||
Preparing the ground for the base of a bungalow.
[06-B-22] | ||
Getting the concrete mixer into position. Cement powder was a scarce commodity and the aggregates were gathered by hand from the river bed by the concrete gang.
[06-B-18] | ||
Pouring the concrete base.
[06-B-23] | ||
[06-B-17] | ||
Setting out the sole plate ...
[06-B-24] | ||
... and the cill flashing.
[06-B-25] | ||
Erecting the first wall panel.
[06-B-26] | ||
[06-B-27] | ||
[06-B-28] | ||
[06-B-29] | ||
[06-B-36] | ||
More panels follow.
[06-B-30] | ||
[06-B-35] | ||
[06-B-33] | ||
[06-B-34] | ||
[06-B-32] | ||
Bolting two panels together.
[06-B-31] | ||
[06-B-37] | ||
Preparing the eaves timbers.
[06-A-31] | ||
[06-A-28] | ||
Erecting the eaves supports.
[06-A-29] | ||
[06-A-30] | ||
[06-A-32] | ||
Preparing the support shelf for the water storage tank.
[05-Z-26] | ||
Installing the water tank shelf.
[06-A-33] | ||
[06-A-34] | ||
The roofing panels being put on.
[06-B-03] | ||
[06-B-04] | ||
[06-B-05] | ||
[06-C-08] | ||
On goes the ridge capping.
[06-C-05] | ||
[06-C-04] | ||
[06-B-06] | ||
[06-D-03] | ||
[06-D-04] | ||
Work is now underway on fitting out the interior.
[06-A-35] | ||
[06-C-14] | ||
[06-C-21] | ||
[06-C-18] | ||
[06-C-19] | ||
Then the electrician starts the wiring.
[06-B-01] | ||
[06-B-02] | ||
[06-C-03] | ||
[06-C-10] | ||
[06-C-12] | ||
[06-C-20] | ||
[06-C-26] | ||
The plumbers at work.
[06-C-31] | ||
[06-C-30] | ||
[06-C-33] | ||
[06-C-34] | ||
The ceiling panels have been installed ...
[06-C-36] | ||
... some better than others.
[06-D-10] | ||
The fuseboard is connected.
[06-C-28] | ||
Finally the air-conditioner goes in.
[06-D-07] | ||
[06-D-11] | ||
[06-D-08] |