Overseas travel of Malcolm Archbald SMITH
[Ref. S.1]
Introduction | Roadside views | Local life | Flora & fauna |
Work on site - building sequence 1
See also |
The shell of the building has been erected.
[05-Z-27] | ||
The central partition then follows.
[05-Z-28] | ||
Bolting the ceiling supports together.
[05-Z-32] | ||
Roof steelwork ready to lift into position.
[05-Z-33] | ||
[06-A-02] | ||
[06-A-03] | ||
Erecting the lateral steelwork.
[06-A-06] | ||
[06-A-07] | ||
The completed steelwork.
[05-Z-31] | ||
Preparing the gable panels.
[05-Z-29] | ||
[06-A-12] | ||
Placing the gable panels.
[05-Z-30] | ||
Fitting the ridge capping to the roof.
[06-A-04] | ||
[06-A-05] | ||
[05-Z-34] | ||
[05-Z-35] | ||
[05-Z-36] | ||
[05-Z-37] | ||
[06-A-01] |
Top of page |