Sudan - Erection sequence
See also |
Lifting off a packed Supacom building from a stack of three.
[03-M-09] | ||
Lifting wall panels.
[03-M-12] | ||
Laying out wall panels.
[03-M-13] | ||
Erecting end wall panel.
[03-M-14] | ||
Locating side wall panel.
[03-M-16] | ||
Carring second end wall panel.
[03-M-17] | ||
Erecting end wall panel.
[03-M-18] | ||
Erecting end wall panel.
[03-M-18] | ||
Locating end wall panel.
[03-M-19] | ||
Fixing end wall panel.
[03-M-20] | ||
Placing the roof panel.
[03-M-21] | ||
The roof panel is in position.
[03-M-22] | ||
The floor panel is down for the centre segmant of the building ...
[03-M-34] | ||
... then the end wall panels are placed...
[03-M-35] | ||
... and the roof lifted on.
[03-M-34] | ||
The pack containing the final segment is temporarily located.
[03-N-01] | ||
The roof panel having been removed, the floor is positioned.
[03-N-02] | ||
The end wall panel ...
[03-N-03] | ||
... and side wall panel are located ...
[03-N-04] | ||
... then the roof panel lifted on.
[03-N-05] |